Competitions  
   
HIGH-SPEED RAIL LINE MUNICH – VERONA

Party issuing the bid:
Brenner Eisenbahn GmbH

Project manager:
Arch.Dipl.-Ing. Peter Klein

Project description:
Comprehensive planning of the configuration of all surface structures along the route between Innsbruck and Brenner with particular attention given to the tunnel portals, galleries, and pit-brow edifices.

     

YOUTH HOTEL ECHTERNACH

Party issuing the bid:
Commune d’Echternach

Project manager:
Arch.Dipl.-Ing.Romain Thiltges

Project description:
Four -star hotel
The construct included a hotel complex with 60 rooms, a gymnasium, and a tennis facility. The architectonic concept was founded on creating the form of a spiral, meant to symbolize both openness to the world and to humanity as well as closeness and security inside the central courtyard.

     

FREQUENTIS CORPORATE HEADQUARTERS

Party issuing the bid:
Frequentis Nachrichtentechnik GesmbH

Project manager:
Arch.Dipl.-Ing.Romain Thiltges in Zusammenarbeit mit Dipl.Ing Gerhard Piringer

Project description:
Planning an office and production center for 600 workers. Estimated total floor surface: 24,000 square meters.

     

HOTEL AM SEE IN LUTZHAUSEN

Party issuing the bid:
association des auberges de jeunesse luxembourgoises

Project manager:
Arch.Dipl.-Ing. Romain Thiltges

Project description:
The task was to propose a design for an environmentally-friendly four-star hotel with ca. 60 suites taking optimal advantage of its unique location on a lake. In our proposal, all the rooms have a view of the water. A large convention center was positioned underground or covered with a grass roof in keeping with the ecological aesthetic. The size of above-ground structures was harmonized with the nearby historic farm buildings. The ecological approach was pursued as well in the use of a wood-chip heating facility, solar panels, and waste water treatment.

     

ÖBB FREIGHT TERMINAL WIEN INZERSDORF

Party issuing the bid:
Österreichische Bundesbahnen
Gebäude und Anlagenservice


Project manager:
Arch.Dipl.-Ing.Peter Klein


Project description:
New construction of a logistics center with special considerations given to the requirements of product delivery as well as loading and unloading company vehicles and outside vehicles and the unloading of freight trains.